Sewage
Pumping Station
Master Plans for Rishon LeZion, Akko, Kiryat Ata, Zichron Yaakov, Safed, Bet She'an.
Detailed Design and overall supervision for the main interceptor of Rishon LeZion - 125 cm dia. Length ~1.5 km.
Detailed design of collector in Bet Hacerm - 50 to 60 cm dia., ~5 km.
Detailed Design of Sewer system in Akko including Main Pumping Station 1,600 cu.m. / hour; force main of dia. 500 - 700 mm, 12 km.
Detailed design of gravitational sewage collection systems in numerous neighborhoods and cities Rishon Lezion, Acre, Kiryat Ata, Zichron Yaakov, Safed, Bet Hacerm.
Haifa Port- sewage system.
Carmel Port-sewage system.
|