Preparation of detailed design and overall supervision for erection of WWTP for the towns of Lower Galilee using the SBR method,
First Stage 12,000 cu.m. /day
Final Stage 18,000 cu.m./day
Effluent quality 20/30.
Detailed design and tender document preparation for WWTP in Ein Shemer to serve several other towns as well for a final stage of 36,000 cu.m./day.
Effluent quality 10/00.
Detailed design of activated sludge WWTP in Kiryat Gat (DBOT),
First Stage 12,000 cu.m./day, Final Stage 24,000 cu.m./day,
Effluent quality 20/30.
Detailed design of activated sludge WWTP in Livnim (DBOT),
Stage 1 - 8,000 cu.m./day, Final Stage - 12,000 cu.m./day,
Effluent quality 10/10.
Detailed design and tender document preparation for (Yavne) WWTP for final stage of 12,000 cu.m/day.
Filtration and treatment facilities for the national main water carrier including the detailed design of the Eftahel River divertion, main pipe (108"), water reservoir - 130,000 cu.m.
Regional Projects
Lower Galilee - Regional Wastewater Treatment and reuse scheme for irrigation with treated effluent, WWTP, 4 pumping stations, ~50 km of pipelines.
Bet Hacrem Valley - detailed design of regional sewage conveyance system, ~55 km of pipelines, 17 pumping stations.